

The existing elevation
The recorded scope addressed a rear stucco wall elevation with prior patches and localized cracking. The work was defined as a broader resurfacing scope rather than a single isolated patch.
Preparation and reinforcement
The project record identifies surface preparation, bonding preparation, treatment of prior patches, and localized crack reinforcement with mesh where needed. These steps prepared the existing elevation for the new finish work.
Integrated finish and detailing
AWC applied a color-integrated finish coat and hand-applied a similar texture across the resurfaced area. The recorded work also included detailing around openings and fixtures, localized paint touchups, protection, and cleanup.
The documented finish
The wide view shows how the finish carries around the building corner and nearby openings. The close view shows the hand-applied texture across the resurfaced wall.
Call